人字形骨架護坡模具 人字骨架護坡模具主要用于高速護坡磚模具、堤壩護坡轉模具的生產,主要防止水土流失作用,人字形骨架護坡模具 人字骨架護坡模具主要采用工程聚丙烯原料或ABS原料注塑成型,骨架護坡模具采用99%原包料生產,可以周轉200次以上,具有密度高、光亮度高、韌性強、不易變形 損率低等優點。人字形骨架護坡模具 人字骨架護坡模具工時應注意以下幾點:
1.施工前應清理坡面,坑凹,使坡面大致平整。
2.澆注人字形護坡骨架前,按設計要求放樣,挖溝,骨架嵌入坡面,必須保證模具埋深。
3.骨架與坡面密貼,骨架流水面應平滑。
4.路塹邊坡存在地下水露頭的,引入排水系統,不可堵塞。
5.骨架擋水緣施工過程中必須與骨架基礎一并澆注,并銜接好,不得形成急流后沖刷自然邊坡,以保證邊坡穩定。
6.邊坡平臺截水溝內的水按施工工點圖上標注的里程合理的匯排入排水溝。
Herringbone skeleton slope protection mold herringbone skeleton slope protection mold is mainly used in the production of high-speed slope protection brick mold and dam slope protection transfer mold, mainly to prevent soil erosion, herringbone skeleton slope protection mold The herringbone skeleton slope protection mould mainly adopts engineering polypropylene raw material or ABS raw material for injection molding. The skeleton slope protection mould adopts 99% raw material for production, which can be turned over for more than 200 times. It has the advantages of high density, high brightness, strong toughness, not easy to deform and low loss rate. The following points should be paid attention to during the working time of herringbone skeleton slope protection mould:
1. Before construction, the slope surface shall be cleaned and filled with pits to make the slope surface roughly flat.
2. Before pouring herringbone slope protection framework, setting out and trenching shall be carried out according to the design requirements, and the framework shall be embedded in the slope surface, and the mold burial depth must be ensured.
3. The skeleton shall be closely attached to the slope surface, and the water surface of the skeleton shall be smooth.
4. If there is groundwater outcrop in the cutting slope, it shall be introduced into the drainage system and shall not be blocked.
5. During the construction of skeleton water retaining edge, it must be poured together with skeleton foundation and connected well. It is not allowed to wash the natural slope after the rapid flow to ensure the stability of the slope.
6. The water in the intercepting ditch of the slope platform shall be reasonably collected into the drainage ditch according to the mileage indicated on the construction site drawing.